Beiträge von Francis7288

    During the last update of my Becker Navis (ready 70 and ready.5), I was also in this one

    Year, I also noticed that not only newly built roads are now correctly drawn, but that there are even streets on the maps that do not yet exist, ie are still under construction. And the navigation system wanted to send me onto these streets too. For example, the southern bypass of Pirna near Dresden is already included (B172), although this should not be ready until 2022.